Present score against projected score
In productionBoth numbers on the same ruler as the Exposure Report.
Application
The PQC Readiness Track translates the post-quantum migration program into two numbers on the same IEQ ruler: today's score and the projected score if the planned milestones are completed. The difference between the two guides which milestone to prioritize — it does not replace the committee's decision, and it is not a compliance attestation.
What is at stake
The PQC Readiness Track's present-day score comes from the same public collection and the same IEQ engine as the Exposure Report. The projection adds the governance gain of the milestones the organization marks as planned, holding the other declared parameters constant — the same mode used to compute the present-day score.
Limitation: The projection depends on the milestones the organization itself declares as planned: it is a simulation over governance hypotheses, not a new collection nor a post-change measurement.
Both numbers on the same ruler as the Exposure Report.
How much each planned milestone would reduce governance exposure, in isolation.
Each milestone checked or unchecked explains the change in the projected score on its own.
What it depends on
Observed
Public collection saw
Calculated
The IEQ engine derived
Declared
The organization reported
Inferred
The model estimated
Out of scope
Other evidence decides
What this comparison is measured against
Limits of the comparison
Boundary
Where measurement ends
Measurement ends at: the technical change in the environment. Measuring exposure does not reduce it: reduction requires changing configuration, replacing certificates, switching negotiation policy, or migrating libraries — work carried out by the organization's own teams and suppliers.
This readout delivers
After the change, GWK
Not included
Share the domain and your program's governance milestones. The result shows today's score, the projected score, and each milestone's gain, with the limits declared above.